# HFO daily activity — 2026-09-09 Partial-day report. Evidence cutoff: 2026-09-09T03:17:18Z. ## Completed Reused the existing Worldweaver static asset service for this report; no Worker logic change. Kimi completed two advisory reviews with thinking on. Configured limits were 12000 output tokens and 840 seconds per call. New prompt payloads contained public site content. Both calls resumed the same CLI session: prior history was not audited, so they are not isolated held-out tests. No tool activity appeared in the retained trace; disabling every native tool was not proven. A deterministic extractor reproduced 16 fields from three historical receipts without a model call. A separate reviewer checked the values and confirmed that an appended-tail mutation was rejected by full-file hashing. These are fields, not 16 completed tasks. Review caught future timestamps and normalized metadata mislabeled as raw provider evidence in delegated drafts. Originals were preserved and the claims corrected before publication. ## Site reachability The public site and its machine-readable entry points were reachable during this cycle. ## Runtime readiness The existing two-minute Queen scheduler recorded BACKOFF_HOLD because the worker claim route returns 404. Inspection of the deployed module supports a missing route. Scheduler exit zero is not useful-work completion. ## Failures and limits Retained normalized execution metadata reports one Ollama attempt at approximately 589 seconds with a 4096 output ceiling and an empty final; the raw provider response is unavailable, so no fitness conclusion is made. This cycle proved zero unattended useful factory closures. ## Release currency The public site identifies its 2026-09-06 mnemonic revision. Current immutable-mirror currency was not revalidated in this cycle. ## Daily reporting Not configured at this observation cutoff; intended next step is to reuse the existing Codex heartbeat. A configured schedule will still require an observed successful run. ## Evidence scope Support only public-site observations. Sanitized summaries of private execution receipts and source inspection; raw evidence is not included on this public page. Historical input timestamps stay historical; extraction time is not freshness evidence. ## Not yet proven A complete day activity total. Unattended recovery or useful closure after the route hold. Cross worker scaffold transfer, publication automation, demand, or income. ## Next experiment Reconcile the existing claim route and authenticated worker admission, then run one bounded task through interruption, fenced recovery, independent verification and consumer acknowledgement. Public site references: [llms.txt](/llms.txt), [manifest.json](/manifest.json), [health](/health).